Now showing 1 - 2 of 2
  • Publication
    Hybrid immune-genetic algorithm method for benefit maximisation of distribution network operators and distributed generation owners in a deregulated environment
    (Institute of Engineering and Technology (IET), 2011-01) ; ; ;
    In deregulated power systems, distribution network operators (DNO) are responsible for maintaining the proper operation and efficiency of distribution networks. This is achieved traditionally through specific investments in network components. The event of distributed generation (DG) has introduced new challenges to these distribution networks. The role of DG units must be correctly assessed to optimise the overall operating and investment cost for the whole system. However, the distributed generation owners (DGOs) have different objective functions which might be contrary to the objectives of DNO. This study presents a long-term dynamic multi-objective model for planning of distribution networks regarding the benefits of DNO and DGOs. The proposed model simultaneously optimises two objectives, namely the benefits of DNO and DGO and determines the optimal schemes of sizing, placement and specially the dynamics (i.e. timing) of investments on DG units and network reinforcements over the planning period. It also considers the uncertainty of electric load, electricity price and wind turbine power generation using the point estimation method. The effect of benefit sharing is investigated for steering the decisions of DGOs. An efficient two-stage heuristic method is utilised to solve the formulated planning problem and tested on a real large-scale distribution network.
      718Scopus© Citations 97
  • Publication
    Possibilistic evaluation of distributed generations impacts on distribution networks
    (Institute of Electrical and Electronic Engineers (IEEE), 2011-03-17) ; ; ;
    In deregulated power systems, the distribution network operator (DNO) is not responsible for investment in distributed generation (DG) units, and they are just concerned about the best architecture ensuring a good service quality to their customers. The investment and operating decisions related to DG units are then taken by entities other than DNO which are exposed to uncertainty. The DNO should be able to evaluate the technical effects of these uncertain decisions. This paper proposes a fuzzy evaluation tool for analyzing the effect of investment and operation of DG units on active losses and the ability of distribution network in load supply at presence of uncertainties. The considered uncertainties are related to load values, installed capacity, and operating schedule of DG units. The proposed model is applied on a test system and also a real French urban network in order to demonstrate its functionality in evaluating the distribution expansion options.
    Scopus© Citations 124  920