Options
BuildingPI: A Future Tool for Building Life Cycle Analysis
File(s)
File | Description | Size | Format | |
---|---|---|---|---|
JamesSimBuild2004.pdf | 603.58 KB |
Date Issued
06 August 2004
Date Available
21T13:52:55Z June 2021
Abstract
Traditionally building simulation tools are used at the design phase of the building project. These models are used to optimise various design alternatives, reduce energy consumption and cost. Building performance assessment for the operational phase of a buildings life cycle is sporadic, typically working from historical metered data and focusing on bulk energy assessment. Building Management Systems (BMS) do not explicitly incorporate feedback to the design phase or account for any changes, which have been made to building layout or fabric during construction. This paper discuses a proposal to develop an Industry Foundation Classes (IFC) compliant data visualisation tool Building Performance Indicator (BuildingPI) for performance metric and performance effectiveness ratio evaluation.
Type of Material
Conference Publication
Language
English
Status of Item
Peer reviewed
Description
The First National IBPSA-USA Conference (SimBuild 2004), Boulder, Colorado, United States of America, August 4-6, 2004
This item is made available under a Creative Commons License
Owning collection
Views
304
Last Month
1
1
Acquisition Date
Jan 29, 2023
Jan 29, 2023
Downloads
24
Acquisition Date
Jan 29, 2023
Jan 29, 2023