Binary PSO-based dynamic multi-objective model for distributed generation planning under uncertainty
File(s)
File | Description | Size | Format | |
---|---|---|---|---|
R2-RPG.pdf | 289.24 KB |
Author(s)
Date Issued
March 2012
Date Available
25T11:04:31Z November 2014
Abstract
This study proposes a stochastic dynamic multi-objective model for integration of distributed generations in distribution networks. The proposed model optimises three objectives, namely technical constraint dissatisfaction, costs and environmental emissions and simultaneously determines the optimal location, size and timing of investment for both distributed generation (DG) units and network components. The uncertainties of electric load, electricity price and wind power generations are taken into account using scenario modelling. A scenario reduction technique is used to reduce the computational burden of the model. The Pareto optimal solutions of the problem are found using a binary particle swarm optimisation (PSO) algorithm and finally a fuzzy satisfying method is applied to select the optimal solution considering the desires of the planner. The effectiveness of the proposed model is demonstrated by applying it to a realistic 201-node distribution network.
Type of Material
Journal Article
Publisher
Institute of Engineering and Technology (IET)
Journal
IET Renewable Power Generation
Volume
6
Issue
2
Start Page
67
End Page
78
Copyright (Published Version)
2012 The Institution of Engineering and Technology
Language
English
Status of Item
Peer reviewed
This item is made available under a Creative Commons License
Owning collection
Scopus© citations
145
Acquisition Date
Feb 5, 2023
Feb 5, 2023
Views
1605
Acquisition Date
Feb 5, 2023
Feb 5, 2023
Downloads
1223
Last Week
1
1
Last Month
615
615
Acquisition Date
Feb 5, 2023
Feb 5, 2023