Repository logo
  • Log In
    New user? Click here to register.Have you forgotten your password?
University College Dublin
    Colleges & Schools
    Statistics
    All of DSpace
  • Log In
    New user? Click here to register.Have you forgotten your password?
  1. Home
  2. College of Engineering & Architecture
  3. School of Biosystems and Food Engineering
  4. Biosystems and Food Engineering Research Collection
  5. A Feasibility Assessment of Photovoltaic Power Systems in Ireland; a Case Study for the Dublin Region
 
  • Details
Options

A Feasibility Assessment of Photovoltaic Power Systems in Ireland; a Case Study for the Dublin Region

Author(s)
Murphy, Fionnuala  
McDonnell, Kevin  
Uri
http://hdl.handle.net/10197/8490
Date Issued
2017-02-18
Date Available
2017-05-09T14:49:29Z
Abstract
Photovoltaic (PV) power generation is one of the cleanest sources for producing renewable energy; however uptake on the Irish renewable energy market to date has been low. There is a lack of support for solar PV systems in Ireland; there is currently no solar PV energy feed-in-tariff as there are for other renewable energy systems in Ireland. Despite the current lack of support, the Government has indicated that support for the uptake of solar PV installations will be provided through the provision of a feed-in tariff in the future. The aim of this study was to determine the feasibility of installing PV systems under Irish climatic conditions at a location based in Dublin, Ireland, from a technical, environmental and economic point of view. This was achieved by carrying out a life cycle assessment of potential environmental impacts, and analysis of energy and economic payback times relating to the proposed PV system. Four possible renewable feed-in-tariffs (based on existing feed-in-tariffs for other renewable energy systems) were considered to determine the effect of such tariffs on the overall economics of the proposed PV system. Results show that life cycle GHG emissions are 69 g CO2-eq per kWh generated by the system, significantly lower than the current electricity grid mix emissions of 469 g CO2-eq per kWh. It will take 5.23 years of operation of the solar plant to generate the same amount of energy (in terms of primary energy equivalent) that was used to produce the system itself. The economic payback time varies from 19.3 and 34.4 years depending on the rate of renewable energy feed-in-tariff applied. The costs for the production of PV electricity in this study are higher than is usual in countries where the solar PV market is more developed, e.g., Germany, due to constraints with building integration and lack of experienced PV installers. As more PV is deployed, the Irish PV installer base will increase and ‘learning by doing’ effects will allow installers to install projects more efficiently and quickly under Irish conditions, leading to significantly reduced costs.
Sponsorship
Science Foundation Ireland
Type of Material
Journal Article
Publisher
MDPI
Journal
Sustainability
Volume
9
Issue
2
Copyright (Published Version)
2017 the Authors
Subjects

Ireland

Solar PV

Greenhouse gas emissi...

Economic payback time...

Energy payback

Time

Feasibility

DOI
10.3390/su9020302
Language
English
Status of Item
Peer reviewed
This item is made available under a Creative Commons License
https://creativecommons.org/licenses/by-nc-nd/3.0/ie/
File(s)
Loading...
Thumbnail Image
Name

sustainability-09-00302.pdf

Size

1.34 MB

Format

Adobe PDF

Checksum (MD5)

50fd80f2a6f16485bb3c9fc672d603b5

Owning collection
Biosystems and Food Engineering Research Collection
Mapped collections
Agriculture and Food Science Research Collection•
Institute of Food and Health Research Collection

Item descriptive metadata is released under a CC-0 (public domain) license: https://creativecommons.org/public-domain/cc0/.
All other content is subject to copyright.

For all queries please contact research.repository@ucd.ie.

Built with DSpace-CRIS software - Extension maintained and optimized by 4Science

  • Cookie settings
  • Privacy policy
  • End User Agreement