Options
Feasibility of pair-housing of rats after cranial implant surgery
File(s)
File | Description | Size | Format | |
---|---|---|---|---|
Evers - feasibility of pair-housing for depository.pdf | 389.15 KB |
Date Issued
10 October 2022
Date Available
27T11:46:09Z February 2023
Abstract
Rat models employing cranial implants are increasingly employed to facilitate neural stimulation and recording in freely moving animals. Due to possible damage to wound, implant or attached devices, rats with cranial implants are traditionally housed singly, and little information is available on group- or pair-housing. Here we describe a protocol for pair-housing rats following cranial implant surgery and describe our experience with pair-housing during post-surgical recovery and up to 16 weeks following surgery.Thirty-six adult Wistar rats of both sexes were implanted with deep brain stimulation electrodes. Ten rats were equipped with an additional wireless headstage. Rats were housed in stable pairs before surgery and re-introduced 0-18 h post-surgery. Rat grimace scores did not indicate pain after conclusion of the analgesia protocol, physiological parameters were in the normal range three days post-surgery and weight loss did not exceed 10%. Rats with a cement cap only were pair-housed continuously without damage to the headcap. Rats carrying an additional fragile headstage had to be separated during lights-off periods to prevent headstage damage but could be pair-housed during lights-on periods. Pair-housing is a feasible and effective method to facilitate the rats' need for social companionship following cranial implant surgery.
Sponsorship
European Commission - European Regional Development Fund
Type of Material
Journal Article
Publisher
SAGE
Journal
Laboratory Animals
Volume
57
Issue
1
Start Page
1
End Page
12
Language
English
Status of Item
Peer reviewed
ISSN
1758-1117
This item is made available under a Creative Commons License
Owning collection
Scopus© citations
0
Acquisition Date
Mar 26, 2023
Mar 26, 2023
Views
21
Acquisition Date
Mar 26, 2023
Mar 26, 2023
Downloads
15
Last Week
3
3
Acquisition Date
Mar 26, 2023
Mar 26, 2023