Options
Possibilistic evaluation of distributed generations impacts on distribution networks
Date Issued
2011-03-17
Date Available
2014-11-17T15:08:51Z
Abstract
In deregulated power systems, the distribution network operator (DNO) is not responsible for investment in distributed generation (DG) units, and they are just concerned about the best architecture ensuring a good service quality to their customers. The investment and operating decisions related to DG units are then taken by entities other than DNO which are exposed to uncertainty. The DNO should be able to evaluate the technical effects of these uncertain decisions. This paper proposes a fuzzy evaluation tool for analyzing the effect of investment and operation of DG units on active losses and the ability of distribution network in load supply at presence of uncertainties. The considered uncertainties are related to load values, installed capacity, and operating schedule of DG units. The proposed model is applied on a test system and also a real French urban network in order to demonstrate its functionality in evaluating the distribution expansion options.
Type of Material
Journal Article
Publisher
Institute of Electrical and Electronic Engineers (IEEE)
Journal
IEEE Transactions on Power Systems
Volume
26
Issue
4
Start Page
2293
End Page
2301
Copyright (Published Version)
2011 IEEE
Language
English
Status of Item
Peer reviewed
This item is made available under a Creative Commons License
File(s)
Loading...
Name
possibilistic.pdf
Size
181.87 KB
Format
Adobe PDF
Checksum (MD5)
130505f5c5c537a4cd9df61cf83c1bb3
Owning collection